View Single Post
Old November 4th, 2013, 11:20 AM   #35
simook
ninjette.org member
 
Name: Kyle
Location: Portland, Oregon
Join Date: Sep 2013

Motorcycle(s): 2008 Ninja 250R

Posts: 106
Spent this last weekend getting a lot of little things down, but my main goal was to get the bike ridable.





Modified the stock cowling stay to work with the race fairings.
















Installed and adjusted the rear-sets.






Well that's not ideal.


Cleaned up the bike stand mount.




Time for a ride.


These fairings are getting dirty, probably time to start thinking about a paint job.



Also got the bike ready for winter storage, that's a load off the mind. As of now I'm feeling pretty good with where things are at. Still have a lot of work to do but it should be all down hill from here.
simook is offline   Reply With Quote