View Single Post
Old March 30th, 2014, 01:50 AM   #35
heffree
ninjette.org member
 
Name: Jeff
Location: Utah
Join Date: Mar 2014

Motorcycle(s): EX250

Posts: 24
Quote:
Originally Posted by Mortifer View Post
The coolant res is now a 1" copper pipe about 7" long. I soldered caps on each end after soldering in two 1/4 tubes in one of the caps, one going down to the bottom. Painted black and hose clamped to the frame.

Yes the fuse panel, starter relay and bike computer are all on a metal tray under the back of the gas tank.
Only the battery and regulator are under the tail.
Hmm, I think I can see what you're talking about in one of the pictures. On the right side of the bike? I'm currently trying to decide how stripped down I want my bike to look since I've already taken all the fairing off. It'd be nice to clean up that whole area a bit. Thanks for the help!
heffree is offline   Reply With Quote