Thread
:
Flying's Rebuild
View Single Post
January 19th, 2017, 01:30 AM
#
28
Flying
ninjette.org sage
Name: -
Location: somewhere cold
Join Date: Jun 2013
Motorcycle(s): 2010 Ninja 250
Posts: 596
Blog Entries:
1
Another round of pictures. The wiring loom restoration is FINALLY done and half of the controls on the bike are mounted. Since the last post I've been staying up late and working on the wiring till 3-6 in the morning. I would rather make one from scratch than do that again!
Nearly every pin has been dipped in acid to remove corrosion and washed. The majority of connectors are sealed with either heat shrink or Super 33+. Once this gets on the bike, the connections will be covered with more tape to prevent moisture from getting in between the plastic.
Flying
View Public Profile
Send a private message to Flying
Find More Posts by Flying
View Blog