I spent a lot of time on reassembly last week, and made good progress...
Almost all of the electrical connections are done.
The front and rear brakes are installed, and filled with fresh fluid.
The carbs, and air filter box are installed. The carbs were done by Ducatiman, and I tore the air box apart to clean it out, prior to installation.
The tail, with lights, is installed.
I ran into a few snags, and must paint a handful of misc. parts to continue.
The shorter handlebar risers that I used are causing the brake and clutch levers to hit the guage pod, and prevent full turn. (
https://faq.ninja250.org/wiki/Loweri...rs_on_a_budget )
I didn't yet paint the grab handle, so I cannot button up the back end until I do.
I need to paint the bar end weights red, for accent.
Oh, and I had to remove the rear wheel, for access.