… But I finally got my bike put back together!
It took nearly two months from the day I laid it down till today (see this thread:
http://www.ninjette.org/forums/showthread.php?t=85494), I endured COUNTLESS setbacks, ended up modding the bike quite a bit, and now have a pretty sweet ride, scuffs, cracks and all.
So over that time, I stripped the bike, and then removed, cleaned, re-jetted, and reinstalled the carbs. After that, I replaced the huge airbox with a K&N pod. I also bought T-Rex frame sliders as well as their front and rear stands. Also, I bought some WC clip-ons and had them installed. I also rewired my integrated rear light thing so that it blinked as well as the stock rear turn signals. Lastly, I saved alot of weight by forgetting where a bunch of screws went.
So here's the bike the day I got it:
Ninja 250-5.jpg
And here is my bike at its lowest point (NSFW):
Ninja 250.jpg
And here is how she sits:
1photo.jpg
2photo.jpg
3photo.jpg
And here is a picture of the damage:
photo.jpg
All in all, I'm very proud of myself, but I can't wait till I can just pay someone to do all of this crap for me…