Winter Project Checklist:
*Fluid change after the November kart track day. Antifreeze in the radiator and fresh oil. Top off fuel tank with E-free and a shot of Seafoam. Oil change and maybe send old oil in for analysis just for shits and giggles.
*Check coolant hard-lines for paint inside.
*Take of fairings and torque every nut/bolt I can find. Consider safety wiring everything and RTV everything I don't.
*De-tab the frame and front fairing bracket.
*De-sticker the fairings, clean up and epoxy over the rashed areas.
*Add a drain plug to belly pan for rain.
*Proper clip-ons.
*Replace chain with 415 chain/sprocket kit.
*Aftermarket exhaust and tune.
*Rear shock.
*Stainless front brake line.
*Maybe an aftermarket front rotor.
*Ignition key eliminator.
*Keyless gas cap.
*Clear tubing reservoir mod for the rear brake.
*Motionpro radiator reservoir.
*Consider getting titanium bolts for brake calipers and rotors/sprocket nuts.
*Maybe try to find a sponsor or two.
__________________________________________________
Let he who has never re-used a crush washer cast the first stone...
Last futzed with by Burphel; October 9th, 2016 at 04:42 PM.
|